DIVCON Work Continues at Transmark Logistics Building

Transmark Logistics Insulated Panels
Transmark Logistics Insulated Panels
Transmark Logistics Insulated Panels
PROJECT: Transmark Pilot Air

DIVCON placed concrete for the first insulated Tilt-Up panels on the Transmark Logistics building located on Thorpe Road. The project began August 23, 2012 with an anticipated completion date in mid-December, 2012. The Transmark building features insulated concrete Tilt-Up exterior walls providing superior insulation and durable interior and exterior walls.

Previous post:

Next post: