Itronix

Itronix

Project Name: Itronix World Headquarters (General Dynamics)

Location: 12825 East Mirabeau Parkway, Spokane Valley, WA 99216

Size: 122,000 sq ft

Type of Construction: Tilt-Up walls with steel joist and deck

Delivery Method: General contractor, design-build

Owner: Pinecroft, LLC

Special Attributes: The fast track schedule was achieved by using Tilt-Up construction. It was completed in 16 months, including design, permitting, and construction. This building met the tenant’s requirements and corporate image.

<<<Back to Projects Page